Switch Language

Privatization of Yatağan thermal power plant

by camara, 29/11/2013

The Republic of Turkey Privatization Administration (PA) has launched the privatization process for the 630 MW Yatağan Thermal Power Plant (“Yatağan TPP”), located in Mugla (The south-west of the country)

The privatization of movable used by Yatağan TPP owned by Yeniköy Yatağan Elektrik Üretim ve Ticaret A.Ş. and movable used by Güney Ege Linyitleri İşletmesi (“GELİ”) through “asset sale” method,

The privatization of immovable used by Yatağan TPP and immovable on which GELİ is located and used by GELİ, through “asset sale” and “transfer of usufruct rights” methods,

Related mining licenses and mining sites covered by these licenses through “transfer of operating rights” method.

The prequalification and bidding deadline set for 30 April 2014 at 17.00 pm.

If you wish to know more about the details of the tender, please click here Teaser Yatağan TPP

If you would like more information, you could contact to Yasemen Korukcu, the Representative of the Investment Support and Promotion Agency of Turkey (ISPAT).

E-Mail: korukcu.yasemen@invest.gov.tr

Yorum yok


Cevap bırakın

Your email address will not be published Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*

Bu site, istenmeyenleri azaltmak için Akismet kullanıyor. Yorum verilerinizin nasıl işlendiği hakkında daha fazla bilgi edinin.

Son yorumlar

    Bültenimize abone olun

    Bizi Facebook’ta takip et